Showing posts with label lift. Show all posts
Showing posts with label lift. Show all posts

Saturday, May 2, 2015

The New Piccolo Lift at Whistler


TOP TRAVEL DESTINATIONS – http://routebyroad.com


You dont really need an excuse to book a winter ski trip to Whistler; after all, it has the highest vertical drop in North America, the biggest skiable area, the most off-piste terrain and the best spas and restaurants. However, if you did need one, the announcement of the new Piccolo lift on Whistler Mountain might just fit the bill.


The Piccolo Express Lift on will run to the Piccolo peak from the bottom of Flute Bowl and will open up more than 1000 acres of the most spectacular high alpine terrain available in North America. This is terrain that has historically been available only to the hardiest of ski-mountaineers, since each vertical metre of descent into this legendary bowl had to be paid for with perhaps half a minute of hard climbing. And given that this lift will be 2112 metres long, with a vertical elevation of 509 metres well, you can do the math. Flute Bowl will now become a hike-in, ski-out bowl thanks to the Piccolo lift.


The new acreage is a mixture of open bowls, deep snow and gladed sub-alpine terrain. It will appeal to advanced and intermediate skiers alike, since it will have both runs through the trees and wide open groomed areas. The path back to Whistler Village or Creekside will be via the Burnt Stew Trail to the bottom of Harmony Express. It is expected to provide significant relief to the frequent queues at Harmony. Plans call for construction to be completed within the summer of 2006 and for the lift, which will be a high-speed detachable quad, to be ready by November. Locals expect that the Piccolo lift will further extend the preference for Whistler over Blackcomb mountains by expert skiers.


So if you did need that excuse, youve got it.



The New Piccolo Lift at Whistler

Thursday, April 30, 2015

Breckenridge Ski Resort Will Build a New Gondola Ski Lift


TOP TRAVEL DESTINATIONS – http://routebyroad.com


After twenty years of wishful thinking, Breckenridge will finally move forward and build the Gondola in Spring of 2006. This project should be completed by Christmas of 2006. The Breckenridge Gondola will fit up to 8 people and will load right in the free skier parking lots. The path of the Gondola will travel through the Shock Hill neighborhood and on to both Peak 7 and Peak 8 base areas.


The Gondola Project is part of a much larger plan that started last year when they built the Imperial Express ski lift and extended a skiing trail directly to the free skier parking lots. Next on the list will be an expansion of the Peak 7 base area to include a restaurant and other facilities.


The town of Breckenridge also plans on diverting traffic off of Main St. with a hope to preserve the old town main street look and feel. There is a lot going on in Breckenridge right now and next year at this time, you will see a complete transformation.


The new Breckenridge Gondola will have a capacity of 3,000 riders per hour, 143 cabins, 7,843 ft. in length, 25 towers, 2 mid stations at Shock Hill and Peak 7 base area, 7.5 minute ride from the transit center to Peak 8 terminal.


We can’t wait to see you out here!

Enjoy your ski vacation in Breckenridge, CO.



Breckenridge Ski Resort Will Build a New Gondola Ski Lift